Ropeway Guwahati

First ropeway of Assam. Total installation of the ropeway was completed in 2019. The length of the journey is almost 2KM over Bramhaputra river.

In case of passenger transport, safety is the most important requirement. All kinds of safety data are collected using our system, verified with allowable limits and parameter values, and only then the operator can operate the ropeway. Maximum speed of the ropeway can be 5.5 m/s.